0The existing power monitoring is mostly general monitoring of the power system inside the building. However the system of Shina not only can measure the power consumption of each individual circuit by installing a distribution board meter on lamps and heating devices, but it also can be linked with an energy management system (BEMS) through this.
0Also, when it is interoperated with the maximum demand power controller (PCU-2000), thorough management of peak load and energy saving can be achieved at the same time.