Home
Business fields
Remodeling solutions
Power control
Outline
- The analog watt-hour meter installed in the existing indoor power distribution panel will be replaced by a digital meter. (No additional work such as drilling is required.)
- If the maximum demand power control unit (PCU-2000) of the Shina System is adapted together with it, the electric charge can be reduced through adequate peak control.
System block diagram
Application examples
- Chungju City Hall : The analog meter was replaced with a digital meter.
- Anyang City Hall : The analog meter was replaced with a digital meter.