ShinaSystem

Business fields

Remodeling solutions

Home Business fields Remodeling solutions

Power control

Outline
  • The analog watt-hour meter installed in the existing indoor power distribution panel will be replaced by a digital meter. (No additional work such as drilling is required.)
  • If the maximum demand power control unit (PCU-2000) of the Shina System is adapted together with it, the electric charge can be reduced through adequate peak control.

System block diagram

Application examples
  • Chungju City Hall : The analog meter was replaced with a digital meter.
  • Anyang City Hall : The analog meter was replaced with a digital meter.